国产91小视频在线观看,国产一区二区免费福利片,在线一区观看,91精品国产一区二区三区左线,福利视频一区二区三区,国产三区视频在线观看,国产视频1区

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.